Located in Tainan City—a region boasting some of Taiwan’s highest solar irradiance—the Xuejia project strategically utilizes land designated by the Ministry of Agriculture as severely subsided. By revitalizing land that was previously unsuitable for agricultural cultivation, Chenya Energy has transformed these areas into high-efficiency solar power facilities.
The Xuejia project breathes new life into non-arable and subsidence-affected land, converting it into a source of stable, renewable power. Phase 1, with a capacity of 48.6 MW, was commissioned in two stages, achieving full grid connection by August 2021. Simultaneously, the 11.1 MW Phase 2 was successfully integrated into the grid in August 2021, bringing the site’s cumulative capacity to an impressive 59.7 MW.
The success of the Tainan Xuejia project serves as a powerful demonstration of Chenya Energy’s diverse portfolio. It proves that our technical excellence extends beyond our industry-leading floating solar solutions to include large-scale, utility-scale ground-mounted installations. Through this project, we are proud to provide the Tainan region with a resilient, reliable, and sustainable energy supply.